Buyer: Department of Mental Health

Department of Mental Health

General Description

SCOPE OF WORK

  • Remove and dispose of old vinyl flooring.
  • Prepare old concrete surface.
  • Install new resilient vinyl tile flooring. Layout below:
    • Flooring shall have a smooth (non-textured) and slip resistant surface.
    • Estimate 250 ft².  Vendor must verify square footage.
    • Install transition strip if necessary.
    • Flooring shall be approximately 3mm as to ensure clearance between entrance door and concrete.
    • Low VOC or VOC free flooring &adhesives shall be used.
  • The flooring products must be agreed upon by the DMH contract person above.
  • The floor must be completed within 45 days of awarding this bid, and within 2 days of starting the project.
  • Walkthrough: Final walkthrough must be completed with Pocasset MHCFacility Director before completion

Additional description below:

This project is inbehavioral health hospital, in-patient care area.Environmental safety is a priority.

  • The contractor will be escorted by DMH staff.
  • The contractor will maintain tool control and safe/away from patents.  Tools may be kept locked within the work area after the workday. 
  • All debris/trash will be removed from the work area at the end of each day.
  • To prevent dust or fumes to enter the patient care area, a fan shall be used to create a negative pressure in the room and exhaust directly to the outside.  This can be done through a window in the room.

Scope of Work / Product List

No Description Found.